• 0

Project Consultancy, Reports & Profiles

Why should start a Business in Turkey?

Turkey is Europe's sixth-largest economy in terms of economic growth and is quickly expanding in investment and business sectors. Foreign investors are drawn to Turkey because of its skilled labour, inexpensive startup costs, and strategic location. Construction, autos and metals, IT, Environment, Energy, Agriculture, Textile, Finance, and Tourism are some of the areas in which you can invest.

Before beginning a business in Turkey, it is critical to identify the regions in which to invest. The following are the four finest provinces to start a business in: Textiles, cement, paper, chemical items, processed food, and much more are available for purchase. The Marmara Region produces 73 percent of Turkey's sunflower and 30 percent of corn, oil, and wine.

Because of its strengths in manufacturing, international trade, and tourism, the Marmara Region is one of Turkey's most appealing places to launch a business. Last year, Turkey attracted $3.93 billion in foreign direct investment, with roughly 3.2 million dollars going to the service sector. There has been an upsurge in Turkey's direct foreign investment as a result of many foreigners choosing to engage in a business there. Most industries, such as banking, manufacturing, and energy, attract the most foreign direct investment.

 

What are the Natural Resources in Turkey?

Iron ore, copper, coal, chromium, antimony, mercury, gold, celestite (strontium), emery, barite, borate feldspar, pyrites, clay, limestone, magnesite, marble, perlite, and pumice are among Turkey's natural resources. The country serves as a vital transit point for crude oil and natural gas supplies. the world's minerals and pumice In the same year, it produced chromite, feldspar, barite, bentonite, kaolin, magnesite, and perlite. Turkey has a gold resource potential of around 23 million ounces. There are currently four working gold mines in the area, with another four in the development stages. According to recent sources, Eldorado Gold Corp's Usak - Kisladag mine, with its 12 million ounce deposit, is the country's greatest gold producer.

 

Natural Gas is a type of fuel that is used Turkey utilises a lot of natural gas, most of which comes from abroad. It does, however, have the potential to enhance its domestic production, particularly through shale gas. Turkey's natural gas production grew to 48.6 billion cubic metres in 2014, up from 0.5 billion cubic metres the previous year.

 

Coal

Turkey produces more coal than oil and gas, and most of it is used to generate electricity. In actuality, Turkey generated nearly 1.5 million tonnes of hard coal, accounting for roughly 40% of the country's total energy production.

 

Ore of Iron

Turkey's iron ore deposits are estimated to be 83 million tonnes and are spread over the country, particularly in Anatolia, Erzincan, Malatya, and Sivas. Due to a lack of reserves, production levels have remained relatively constant throughout time. The Avnik mine, located in Bingol Province, some 452 miles east of Ankara, has one of Turkey's greatest iron ore reserves. Includes 44 million tonnes of iron metal and has an estimated reserve of 105 million tonnes of ore grading 42 percent iron.

 

Gold

Gold is mined on a small scale in several parts of Turkey. In 2012, a total of 29.5 tons of gold were mined throughout the country, making Turkey a major gold producer. The largest gold mine in the country is the KışladaÄŸ mine, which located in UÅŸak Province, and is owned and operated by the Canadain-based Eldorado Gold Company. The Çöpler mine is also one of the largest gold mines in Turkey and the world.

 

What are the Business Opportunities in Turkey?

Turkey is strategically located in Europe and the Middle East, making it a significant hub of trade and business for both Europe and the Middle East. As a result, you have a strong chance in Turkey to develop and extend your business idea.

 

1. In Turkey, you will find a hardworking youth labour for your business ideas. This is a huge benefit for young businesses when it comes to beginning a firm. Turkey is a natural stone storehouse and one of the world's top exporters. Furthermore, the country is ranked fourth in the world for marble manufacturing. As a result, natural stone mining is a promising as well as successful business opportunity for you. Natural stones such as marble, limestone, basalt, tuff, granite, travertine, onyx, and slate can all be mined.

 

2. Turkey has a large and expanding automobile sector. As a result, selling vehicle components is a viable business opportunity for you. Establish a facility that will produce a variety of automotive spare parts.

 

3. Turkey's textile sector is rapidly expanding and gaining international recognition. As a result, you could consider starting a garment export business. If you know how to design clothes and have a good sense of style, you can create your own label and sell them both domestically and internationally.

 

4. It involves little capital, making it simple to get started. You can sell Turkish specialties as well as famous fast cuisine such as burgers and French fries. Keep in mind that the food should be of top quality and fresh. Due to the enormous number of people who go out to work, packaged food delivery is a very profitable business in Turkey.

 

5. As a result, your restaurant will attract both local and tourist consumers. Serve authentic cuisine and invest in a nice environment and serving ware for your restaurant. Keep in mind that the cleanliness of your restaurant and the quality of your employees are critical.

 

Business-Friendly Policies and Government Initiatives;

Turkey is one of those countries is where starting a business is very simple. If you still need confidence, there are numerous regulations that make life easier for entrepreneurs, as well as numerous institutions and other services that help new businesses succeed. The Turkish government has implemented a number of measures in recent years aimed at improving the business climate and making it simpler for entrepreneurs to start and run enterprises. Furthermore, government efforts such as Make in Turkey have been developed in order to encourage foreign investors to establish manufacturing facilities in Turkey. The country is also pursuing an extremely ambitious plan to attract $100 billion in foreign investment by 2023. These government-sponsored initiatives have a direct impact on your capacity to start and run a business in your country. You'll need to know what these regulations are and how they affect your sector, whether it's building permits or tax incentives. The Turkish government has worked hard to strengthen its business-friendly regulations and initiatives, making it easier for entrepreneurs to start new firms. Starting a business in Turkey is now much easier for foreigners. Many enterprises, particularly digital businesses like e-commerce stores and web development firms, are eligible for special tax treatment (reduced taxes). TEPAV, for example, is a specific programme that assists entrepreneurs with marketing and market research.

 

Turkey Industrial Infrastructure;

Turkey's industrial expansion has been swift, and it is on its way to becoming one of Europe's major manufacturing hubs. The Turkish economy is relatively diverse, having representation from nearly every industry sector. Textiles and apparel, food processing, automotive parts, mining, construction materials (e.g., cement), chemicals and petrochemicals (including plastics), metallurgy and metal products (including automobiles), electronics and electrical equipment, home appliances, and furniture are among the most important industrial sectors. Turkey has a well-developed infrastructure with modern amenities. The country has great transportation and communication infrastructure, making it simple for businesses to import and export commodities. There are also incentives for new investment in industrial regions, as well as protection for existing assets, ensuring that investors remain secure.

Another advantage of investing in Turkey is that you can utilise your foreign company as an exporter or importer from/to other countries with which Turkey has free trade agreements (FTAs). Modern ports, airports, roadways, railroads, telecommunications networks, schools, and hospitals make up Turkey's urban and industrial infrastructure. With a population of more than 70 million people, the country is densely populated. Because of these factors, it is one of the most appealing markets for exporters all around the world.

 

What are the steps for Starting a Business in Turkey?

To begin, you must first register your business name and legal structure with the EAD (Trade Register Office) or MERSS (Merchant Register Service) (Registry) second, you can submit an application to EAD for an official registration certificate. After you've completed these steps, you'll be given your new company's trade number. . You can now begin selling items and services. When it comes to income taxes, there are two types: corporate and personal income taxes. Companies pay corporate tax on their profits, while individuals pay personal income tax on their earnings. When you start a business in Turkey, you must pay both forms of taxes. .

Individuals pay personal income tax on their earnings. When you start a business in Turkey, you must pay both forms of taxes. In Turkey, taxes are computed using a variety of factors such as sales volume, profit margin, and so on. As a general guideline, if you earn more than 1 million Turkish Liras ($230K) each year, you should hire an accountant and follow all tax requirements set down by the government.

 

Market Size of Turkey

Turkey's population has been growing at a pace of 1.33 percent each year (6.98 million people, according to the United Nations World Population Prospects) since 1951, and is expected to reach 79.5 million by 2050, an increase of 2.4 times from 2000 levels. During the period 2010–2050, the country's working-age population—defined as those aged 15 to 64—will expand by more than 5 million individuals, or an 18% increase. By 2020, Turkey will have a workforce of more than 25 million people. Furthermore, life expectancy has consistently increased in recent decades, reaching 70.8 years for males and 75.7 years for women in 2009.

This trend is anticipated to continue in the next decades, driving up demand for products and services such as health care, transportation, and recreational activities, among other things. Turkey's economy is among the world's 20 largest, with a gross domestic product (GDP) of $947 billion and an annual growth rate of 4.5 percent from 2012 to 2013. The country has a young population, with more than half of the population under 30 years old, and it is growing: total fertility declined from 5.2 children per woman in 1950–55 to 2.1 children per woman in 2000–05, but it remains one of the highest fertility rates among OECD countries. Turkey is one of Europe's major economies, with a population of about 75 million people.

It's also one of Europe's largest countries, with 11.4 million square kilometres, so there are plenty of prospective clients for your business! The country has a diverse range of tourist attractions, including modern cities and attractive beaches, as well as historical ruins and natural beauties. These company ideas for Turkey that have previously established their worth are the greatest place to start for entrepreneurs looking for inspiration.

 

Industrial Growth

Turkey has become an international business centre thanks to multinational firms such as TÜBTAK, Koç Holding, and Sabanc Holding. According to emsi Bayraktar, President of the Istanbul Chamber of Commerce, Turkey is one of the world's fastest-growing economies, with plenty of opportunities for entrepreneurs. It has a well-educated, young population and several entrepreneurial opportunities. ies. Being able to communicate in multiple languages (both Turkish and English are official) would make it easier for you to deal with people from various countries. If you're thinking about beginning your own firm, keep in mind that we can only expand our economy with strong and long-term growth. It is possible to reach this goal via boosting industrialization.

Vertical integration is one strategy for Turkish entrepreneurs to pursue industrial growth by forming strategic alliances with other entities. Everyone appears to want a piece of Turkey's burgeoning industrial sector at times. The government has helped by relaxing rules and introducing new legislation, but there are other benefits for individuals who want to take advantage of Turkey's industrialization. You will require financial assistance in order to establish a business. Industrial expansion is critical whether you're launching a new business or taking over an established one. Turkey's industrial industry is responsible for most of the country's economic success. It has developed into an industrial centre due to its closeness to Europe and well-built infrastructure.

 

Scope of Chemical Industry in Turkey

Turkey's chemical sector is quickly expanding, and as Europe's principal chemical export and import partner, Turkey is an important industrial centre for foreign investors. Chemicals are essential to modern living and the chemical industry's growth. The chemical industry is extremely important to the Turkish economy. Chemicals account for 7.7% of overall exports, with finished goods accounting for 15.2 percent and raw materials accounting for 3.8 percent, respectively, according to TÜK numbers published on January 24, 2001. 4. Despite the fact that chemicals are not one of Turkey's top five export categories, their importance as an export category is steadily increasing. Chemicals placed ninth in terms of export value in 2013.

Chemicals accounted for 2.6 percent of total imports and 2.4 percent of total exports in 2012-2013 (July-June), helping to raise the standard of living, which is a measure of a country's level of industrialization. Pharmaceuticals, synthetic soaps, and detergents are among the industries where chemical industry goods contribute considerably to growth. Pharmaceuticals, synthetic soaps, and detergents are among the industries where high investment, low profitability, and foreign investment are necessary. Profited from the new economic policies, and both production and exports increased significantly.

Turkey's chemical industry, with its modern technology and diverse products, is now a key component of the industry and is integrated into the supply chain of national industries. Turkey, in particular, has been manufacturing chemicals for a long time, producing a wide range of basic and intermediate chemicals as well as petrochemicals. Petrochemicals, inorganic and organic chemicals, fertilisers, paints, medicines, soaps and detergents, synthetic fibres, essential oils, and other chemicals are all produced in Turkey. Turkey's chemical industry exports have also increased. Indeed, between 2007 and 2020, chemical exports increased by 7%, reaching a total value of US$8.9 million.

Turkey produces and exports some of the most important chrome compounds and derivatives, such as sodium basic chrome sulphate, chromic acid, and chrome oxide, as one of the top five countries supplying chrome ore to world markets. Turkey also has a competitive advantage in boron compounds (borax dehydrate, borax pentahydrate, boric acid, and sodium perborate) because of the magnitude of its reserves, mineral quality, and proximity to consumer markets.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Starting a Business? Here's the Best Plans for You!
Starting a Business? Here's the Best Plans for You!

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress (Talalay Process)
A Business Plan for Latex Mattress (Talalay Process)

Latex mattress... Read More

Capacity :
Latex Mattress Size 75 x 70 x 5 inch (33Kg) 30 Nos. Per Day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
208.00Lakhs
Add To Inquiry Basket
Setup plant  Of WIRE NAILS
Setup plant Of WIRE NAILS

Wire nails are a type of fastener, often used in construction and building projects. ... Read More

Capacity :
Wire Nails 160 MT Per Day
Plant and Machinery cost:
2635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
3550.00Lakhs
Add To Inquiry Basket
Setup Plant Of Sodium Bicarbonate  from Soda Ash
Setup Plant Of Sodium Bicarbonate from Soda Ash

 

Sodi... Read More

Capacity :
Sodium Bicarbonate (Powder) 100 MT Per Day
Plant and Machinery cost:
1765.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
3248.00Lakhs
Add To Inquiry Basket
A Business Plan For Wall Putty
A Business Plan For Wall Putty

 

Wall... Read More

Capacity :
Wall Putty 1,850 Bag Per Day
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
412.00Lakhs
Add To Inquiry Basket
Get Started Today and Explore Your Business of Carbon Black N990 Now!
Get Started Today and Explore Your Business of Carbon Black N990 Now!

What is Carbon Blac... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!

What is Rice Bran Oil (Edible Oil)? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of TRANSFORMER OIL
Start Production Of TRANSFORMER OIL

Transformer oil is a type of specialized oil that is used as an insulation and cooling medium in electric... Read More

Capacity :
Transformer Oil 100 KLS Per Day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
9300.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica Gel Crystal & Beads    from Sodium Silicate and Sulphuric Acid
A Business Plan for Silica Gel Crystal & Beads from Sodium Silicate and Sulphuric Acid

Silica Gel crystals & beads from sodium silicate and sulphuric acid are small porous granules made of silica. The process of manufacturing thes... Read More

Capacity :
Silica Gel Crystals & Beads 1000 MT Per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
912.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags  From Corn Starch Plant
Biodegradable Plastic Bags From Corn Starch Plant

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation characteris... Read More

Capacity :
45 kg/hr
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Industry of Geogrid
Start Industry of Geogrid

Geogrid is a polymeric or steel-reinforced plastic grid material used to reinforce soils and create a stronger, more durabl... Read More

Capacity :
Geogrid 30,000 Sq.Mtrs Per Day
Plant and Machinery cost:
879.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1766.00Lakhs
Add To Inquiry Basket
Start Herbicides Production From Artemisia Annua
Start Herbicides Production From Artemisia Annua

 

Artemisia annua, ... Read More

Capacity :
-
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
370.00Lakhs
Add To Inquiry Basket
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging

Four businesses that are now seeing great success in the market are soy nuggets, tea ... Read More

Capacity :
-
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity :
-
Plant and Machinery cost:
275.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
963.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging hi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Manganese From Manganese Ore
Start Manufacturing Business Manganese From Manganese Ore

Manganese is a chemical ele... Read More

Capacity :
Manganese Ingot 10 MT Per Day
Plant and Machinery cost:
666.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2192.00Lakhs
Add To Inquiry Basket
Soda Ash Market of Middle East and North Africa (MENA)
Soda Ash Market of Middle East and North Africa (MENA)

Sodium carbonate, often known as soda ash, is a whit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Calcium Silicate Blocks
Start Production Of Calcium Silicate Blocks

 

Calcium silicate ... Read More

Capacity :
Calcium Silicate Blocks 100 Sq.Mt. Per Day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
408.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity :
Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity :
-
Plant and Machinery cost:
1519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity :
Ammonium Nitrate 2 MT per Day
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity :
Silicon Wafers 20 MT Per Day
Plant and Machinery cost:
2505.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity :
-
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity :
-
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity :
-
Plant and Machinery cost:
1783.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity :
Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost:
489.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

 

Laundry soap bars... Read More

Capacity :
Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
Start Business of Solar Panel
Start Business of Solar Panel

 

Solar panels are the bac... Read More

Capacity :
Solar Panel 19,980 KW Per Annum
Plant and Machinery cost:
160.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
581.00Lakhs
Add To Inquiry Basket
A Business Plan for Calcium Gluconate
A Business Plan for Calcium Gluconate

Calcium Gluconate is a chemical compound that serves as a crucial supplement for thos... Read More

Capacity :
Calcium Gluonate 20 MT Per Day
Plant and Machinery cost:
293.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
1130.00Lakhs
Add To Inquiry Basket
Start Business of Steel Containers (Cargo Containers)
Start Business of Steel Containers (Cargo Containers)

 

Explore the robust world of steel cargo containers used globally for shipping, storage, and modular construc... Read More

Capacity :
Cargo Containers (Size 20 Feet) 40,000 Nos Per Annum
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3105.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress
A Business Plan for Latex Mattress

Latex Mattresses are distinguished by their core material, which is derived from the sap of the rubber tree (Hevea bra... Read More

Capacity :
Latex Mattress Size: 75 x 72 x 5 inch 90 Nos. Per Day
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
626.00Lakhs
Add To Inquiry Basket
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)

Spices are naturally occurring substances derived from parts of plants such as seeds, fruits, roots... Read More

Capacity :
-
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production


Th... Read More

Capacity :
-
Plant and Machinery cost:
324.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
684.00Lakhs
Add To Inquiry Basket
Setup Coking Coal Washing Unit
Setup Coking Coal Washing Unit

 

Coking coal w... Read More

Capacity :
Coal Washing (Job Work) 5,000 MT Per Day By Product (Waste Coal) 1,000 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
1.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
1.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Steel Rebars  (Thermo-Mechanically Treated)  - TMT Bars Manufacturing from Scrap
Steel Rebars (Thermo-Mechanically Treated) - TMT Bars Manufacturing from Scrap

Manufacturing steel rebars  {thermo-mechanically treated (TMT)} bars from scraps is one of the ... Read More

Capacity :
(Thermo-Mechanically Treated-TMT): 500 MT Per Day Slag (By Product): 33.3 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
5800.00Lakhs
Add To Inquiry Basket
Introduction to Butyl Rubber (Polyisobutylene Rubber) Manufacturing
Introduction to Butyl Rubber (Polyisobutylene Rubber) Manufacturing

Butyl Rubber, also known as Polyisobutylene Rubber, is a critical material in the dynamic world of i... Read More

Capacity :
5010 MT Per Annum
Plant and Machinery cost:
642.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
1274.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder Production: A Profitable Business for Startups and Entrepreneurs
Moringa Leaf Powder Production: A Profitable Business for Startups and Entrepreneurs

 

One of the most promising and sustainable business ideas in the current global econom... Read More

Capacity :
400 Kgs. Per Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
179.00Lakhs
Add To Inquiry Basket
Saline Manufacturing: A Promising Venture for Startups and Entrepreneurs
Saline Manufacturing: A Promising Venture for Startups and Entrepreneurs

 

Startups together with entrepreneurs should consider Saline Manufacturing (0.9% Sodiu... Read More

Capacity :
2,000 Bags Per Day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
573.00Lakhs
Add To Inquiry Basket
Crumb Rubber Powder from Waste Tyre Manufacturing: A Promising Venture for Startups
Crumb Rubber Powder from Waste Tyre Manufacturing: A Promising Venture for Startups

 

Entrepreneurs looking for innovative and sustainable business options should explore ... Read More

Capacity :
Crumb Rubber Powder: 10 MT Per Day By Product Steel Wire: 2 MT Per Day
Plant and Machinery cost:
78.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
326.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity :
Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1204.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manganese from Ferromanga... 5 MT/Day 47.43 226.00
Low Carbon Ferromanganese 50 MT/Day 66.12 1129.00
Sulfuric Acid 6 MT/Day 14.00 480.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
12345678910...

Showing 481 - 540 of 703 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.